• Toaster Switch Endurance Test Machine for IEC60335-2-9 Testing Equipment
  • Toaster Switch Endurance Test Machine for IEC60335-2-9 Testing Equipment
  • Toaster Switch Endurance Test Machine for IEC60335-2-9 Testing Equipment
  • Toaster Switch Endurance Test Machine for IEC60335-2-9 Testing Equipment
  • Toaster Switch Endurance Test Machine for IEC60335-2-9 Testing Equipment
  • Toaster Switch Endurance Test Machine for IEC60335-2-9 Testing Equipment

Toaster Switch Endurance Test Machine for IEC60335-2-9 Testing Equipment

Warranty: One Year
Max Diameter of Workpiece: <500mm
Mass Scope of Workpiece: <900kg
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Toaster Switch Endurance Test Machine for IEC60335-2-9 Testing Equipment pictures & photos
Toaster Switch Endurance Test Machine for IEC60335-2-9 Testing Equipment
US $4,900-5,000 / Piece
Min. Order: 1 Piece
Gold Member Since 2013

Suppliers with verified business licenses

Secured Trading Service
Rating: 5.0/5
Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
ZLT-DSK
Type
Appliances Tester
Maxcapacity
0
Accuracy Grade
1
Load Way
Mechanical Load
Loading Method
Static Load
Display
Digital
Control
Electricity
Weight
0-100Kg
Power Source
AC220V
Usage
Determine on off of Switch of Toaster
Certification
ISO17025 Calibration Provided
Material
Stainless Steel Cabinet
MOQ
1 PC
Delivery
in 25-30 Days
Transport Package
in Plywood Carton
Specification
IEC60335-2-9 clause 19.101.
Trademark
ZLTJC
Origin
Guangzhou, Guangdong, China
HS Code
9031809090
Production Capacity
Stock Available

Packaging & Delivery

Package Size
78.00cm * 60.00cm * 120.00cm
Package Gross Weight
50.000kg

Product Description

Toaster Switch Endurance Test Machine

Product details: Model ZLT-DSK.

To determine on-off life of switch of the toasters, in accordance with the IEC60335-2-9 clause 19.101.
Toasters are operated at rated power input and under normal operation, but without bread, for six cycles of operation. The appliance is then allowed to cool to approximately room temperature.
This test is carried out 500 times.

Standard Outfit:

1 electronic control system, automatic detection of working current of test sample, upper and lower limits of current detection are adjustable, automatic repeated startup and counting function is available and power-on time(0~99 min), cooling time(0~99 min) and power-off time(0~99 min) can be set separately,
1 mechanical device, for provide keys of vertical and horizontal, and spring is used as buffer to protect test sample key,
1 cooling fan, 100 w,
1 infrared temperature measurement device,
1 electronic predetermining pulse counter, 4-digit, to indicate the number of cycles,
Power Supply: 220V 50Hz, other voltages on request.
Toaster Switch Endurance Test Machine for IEC60335-2-9 Testing EquipmentToaster Switch Endurance Test Machine for IEC60335-2-9 Testing EquipmentToaster Switch Endurance Test Machine for IEC60335-2-9 Testing EquipmentToaster Switch Endurance Test Machine for IEC60335-2-9 Testing Equipment

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Toaster Switch Endurance Test Machine for IEC60335-2-9 Testing Equipment pictures & photos
Toaster Switch Endurance Test Machine for IEC60335-2-9 Testing Equipment
US $4,900-5,000 / Piece
Min. Order: 1 Piece
Gold Member Since 2013

Suppliers with verified business licenses

Secured Trading Service
Rating: 5.0/5
Manufacturer/Factory & Trading Company
Number of Employees
20
Year of Establishment
1999-04-01